Case Study: Fire Hydrant & Pump Room System Installation

Better Sleep Solutions Pvt. Ltd. is a leading manufacturer of premium mattresses with a large-scale production facility in Sonipat, Haryana. As part of their commitment to workplace safety and regulatory compliance, the company partnered with Agnim Engineerz to design and install a comprehensive fire protection system covering hydrants, pump room, and water monitors.

The objective was to provide an end-to-end fire safety infrastructure capable of addressing potential fire hazards associated with foam, adhesives, and other flammable materials commonly used in mattress manufacturing.

Scope of Work Executed by Agnim Engineerz

Agnim Engineerz undertook the complete turnkey project, which included:


  1.  Fire Hydrant System Installation
    1. Complete external and internal hydrant network using MS pipes and valves
    2. Hydrant landing valves and hose boxes installed at strategic points across the factory premises
    3. Hose reels and nozzles placed for easy accessibility during emergencies
  2. Pump Room System
    1. Design and installation of a dedicated fire pump room equipped with electric-driven main pump, diesel-driven standby pump, and jockey pump
    2. MS pipeline interconnection, pressure gauges, control valves, and automation setup
  3. Water Monitors Installation
    1. Installation of ground water monitors to cover open yard and raw material storage areas

Challenges & Solutions

  1. Challenge 1: Limited space for pump room installation.
    Solution: Compact modular pump room layout designed for safety and accessibility.
  2. Challenge 2: High fire load due to foam and fabric storage.
    Solution: Strategic hydrant and monitor placement for full coverage in high-risk zones.

Outcome

  1. Full compliance with NBC and TAC guidelines
  2. Enhanced fire response readiness and operational safety
  3. Positive feedback from local fire department inspections

Key Highlights

  1. Turnkey Fire Hydrant & Pump Room Installation
  2. NBC/TAC Compliance
  3. Enhanced Fire Safety for Manufacturing Environment
  4. Timely Project Completion